{"status":200,"message":"Success","data":{"id":"8685f0c4-868e-54b6-a286-ef68c52c8f8b","title":"Renewable Energy Production Tax Credit (PTC)","identifiers":{"otherIds":{"opp:opengrants:program":{"registry":{"code":"opp:opengrants:program","url":"https://opengrants.io/common-grants/registries/opp-opengrants-program.json"},"id":"ut:energy-renewable-production-tax-credit"}}},"status":{"value":"open","description":"Rolling — applications accepted continuously"},"description":"The Office of Energy Development certifies the Production Tax Credit for large-scale solar PV, wind, biomass and geothermal electricity projects over 660 kilowatts nameplate capacity. The credit is 0.35 cents per kilowatt hour produced during the project's first 48 months after its commercial operation date. Solar projects between 660 kW and 2 MW may choose this credit or the commercial Renewable Energy Systems Tax Credit; solar projects over 2 MW can use only the PTC.","funding":{"details":"$0.0035 per kWh produced during the first 48 months of operation"},"funders":{"primary":{"id":"9ccfefbf-1d95-5a22-98db-2ea5ad30811f","name":"Utah Office of Energy Development","identifiers":{"otherIds":{"org:us:ut:agency":{"registry":{"code":"org:us:ut:agency","url":"https://opengrants.io/common-grants/registries/org-us-ut-agency.json"},"id":"OED"}}}}},"keyDates":{"closeDate":{"name":"Application deadline","eventType":"other","details":"Ongoing","description":"Rolling — applications accepted continuously"},"otherDates":{"cycle":{"name":"Application cycle","eventType":"other","details":"Applications through the office's Apply Here link; no window. Systems placed in service after January 1, 2028 are not eligible."}}},"acceptedApplicantTypes":[{"value":"for_profit_small_business","description":"Business"},{"value":"for_profit_not_small_business","description":"Business"}],"source":"https://energy.utah.gov/homepage/tax-credits/production-tax-credit/","customFields":{"eligibilityCriteria":{"name":"eligibilityCriteria","fieldType":"object","value":{"details":"Solar PV, wind, biomass and geothermal electricity generating projects over 660 kW nameplate capacity. The page says the credit expires for systems completed and placed in service after January 1, 2028 (HB 264, 2025). Owners of large-scale renewable electricity generating projects."},"description":"Who is eligible, in the funder's words","schema":"https://commongrants.org/custom-fields/eligibilityCriteria"},"additionalInfo":{"name":"additionalInfo","fieldType":"object","value":{"url":"https://energy.utah.gov/homepage/tax-credits/","description":"Utah Office of Energy Development grants page"},"description":"Where the agency publishes its programs","schema":"https://commongrants.org/custom-fields/additionalInfo"},"fundingInstrument":{"name":"fundingInstrument","fieldType":"string","value":"tax credit","description":"grant, loan, grant+loan, tax credit, rebate, in-kind or other","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"fundingSource":{"name":"fundingSource","fieldType":"string","value":"State","description":"State, Federal, Federal and State, or Other","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"lastSyncedAt":{"name":"lastSyncedAt","fieldType":"string","value":"2026-11-29T06:07:58Z","description":"When the OpenGrants record data behind this opportunity was last refreshed (UTC)","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"stateCode":{"name":"stateCode","fieldType":"string","value":"UT","description":"USPS code of the state whose agency offers this funding","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"agencyKey":{"name":"agencyKey","fieldType":"string","value":"energy","description":"Portal key of the administering agency","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"agencyAbbrev":{"name":"agencyAbbrev","fieldType":"string","value":"OED","description":"Administering agency abbreviation","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"agencyUrl":{"name":"agencyUrl","fieldType":"string","value":"https://energy.utah.gov/","description":"Administering agency website","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"categories":{"name":"categories","fieldType":"array","value":["Energy"],"description":"Portal categories","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"applicantTypes":{"name":"applicantTypes","fieldType":"array","value":["Business"],"description":"Portal applicant types","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"applicantTypesNotes":{"name":"applicantTypesNotes","fieldType":"string","value":"Owners of large-scale renewable electricity generating projects.","description":"Notes on who may apply","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"purpose":{"name":"purpose","fieldType":"string","value":"A per-kilowatt-hour state tax credit for large solar, wind, biomass and geothermal projects.","description":"One-line purpose","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"geography":{"name":"geography","fieldType":"string","value":"Statewide","description":"Geographic limits within the state","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"fundingMethod":{"name":"fundingMethod","fieldType":"string","value":"Other","description":"Reimbursement(s), Advance(s), Advances & Reimbursement(s) or Other","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"estimatedAmounts":{"name":"estimatedAmounts","fieldType":"string","value":"$0.0035 per kWh produced during the first 48 months of operation","description":"Estimated award amounts, as published","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"howToApply":{"name":"howToApply","fieldType":"string","value":"Apply through the Office of Energy Development's online application linked on the page.","description":"How to apply","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"electronicSubmission":{"name":"electronicSubmission","fieldType":"string","value":true,"description":"Where applications are submitted (url: … or email: …)","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"statutoryAuthority":{"name":"statutoryAuthority","fieldType":"string","value":"HB 264 (2025) sets the expiration, as cited on the page","description":"Statute or rule authorizing the program","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"cycle":{"name":"cycle","fieldType":"string","value":"Applications through the office's Apply Here link; no window. Systems placed in service after January 1, 2028 are not eligible.","description":"Application cycle pattern","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"nextDeadlineDisplay":{"name":"nextDeadlineDisplay","fieldType":"string","value":"Rolling","description":"What the portal shows as the next deadline","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"deadlineSource":{"name":"deadlineSource","fieldType":"string","value":"editorial","description":"editorial, record or cycle","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"stringsAttached":{"name":"stringsAttached","fieldType":"string","value":"Earned only on electricity actually produced in the first 48 months. Solar projects from 660 kW to 2 MW must choose between this credit and the commercial RESTC. Not available for systems placed in service after January 1, 2028.","description":"The catch: match, reporting, restrictions","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"programSlug":{"name":"programSlug","fieldType":"string","value":"energy-renewable-production-tax-credit","description":"Stable program slug within the portal","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"programUrl":{"name":"programUrl","fieldType":"string","value":"https://opengrants.io/grants-in-utah/#p-energy-renewable-production-tax-credit","description":"Program card on the portal page","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"bindingMode":{"name":"bindingMode","fieldType":"string","value":"none","description":"record, upstream, pending-import or none","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"verifiedOn":{"name":"verifiedOn","fieldType":"string","value":"2026-11-12","description":"Date the official page was last checked","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"},"cardStatus":{"name":"cardStatus","fieldType":"string","value":"published","description":"published, needs_review or retired","schema":"https://opengrants.io/common-grants/schemas/state-portal-v1.json"}},"createdAt":"2026-11-12T00:00:00Z","lastModifiedAt":"2026-11-12T00:00:00Z","competitions":[],"awards":[]}}